Global Leader in International Production Industry News

posted in:

Antrim Energy Inc. announces production resumed at Causeway field, UK Northern North Sea

Monday, Jan 21, 2013

Antrim Energy Inc. (TSX:AEN) (AIM:AEY) ("Antrim" or the "Company")Production has resumed from Antrim's Causeway Field (Antrim 35.5% interest) in the Northern North Sea, following a shut-in period of three days. The nearby Cormorant East Field (Antrim 8.4% interest) is expected to resume production in the next few days. This announcement is further to the announcement of January 16, 2013 that the export infrastructure system ("Export System") used by Causeway and Cormorant East was unavailable due to a precautionary shutdown of the Cormorant Alpha platform and the Brent Pipeline System. Antrim has now been notified by the Export System Operator, TAQA Bratani Limited, that the flow of crude oil to the Brent Pipeline System has been restored. Cormorant Alpha production (which does not include production from Causeway or Cormorant East) remains shut-in.

Production from both Causeway and Cormorant East is processed at the North Cormorant platform before being exported in a co-mingled stream across the Cormorant Alpha platform to the Brent Pipeline System entry point (located on the Cormorant Alpha platform) for onward transportation to the Sullom Voe terminal and subsequent sale. Approximately 80,000 barrels of oil per day ("bopd") of production from fields upstream of the Cormorant Alpha platform is exported via the Brent Pipeline System.

Additional information concerning Antrim Energy Inc. is available at www.antrimenergy.com. Investor inquiries may be directed to info@antrimenergy.com or 1-403-264-5111.

Source: Marketwire

To access over 3,000 of the latest oil projects from across the world visit Projects OGP for free trial today

posted in:

Other Production News

Drilling and production update 18-04-2014
Dejour sees 60% increase in net production at Woodrush 16-04-2014
Oil and gas drilling and production brought to life 15-04-2014
Platform P-20 resumes production 09-04-2014
Gastar Exploration announces Marcellus shale production temporarily interrupted due to rupture of third party-operated pipeline 09-04-2014
Petrobras starts-up third well at SapinhoĆ” field and registers a new monthly production record in the pre-salt 07-04-2014
Production March 2014 07-04-2014
New Zealand Energy reports 2013 year-end reserves and production update 03-04-2014
Drilling permit for well 7324/7-2 in production licence 537 03-04-2014
CANADIAN NATURAL RESOURCES LIMITED COMPLETES THE ACQUISITION OF CERTAIN CANADIAN ASSETS OF DEVON CANADA 02-04-2014