Global Leader in International Production Industry News

posted in:

CB&I - www.youroilandgasnews.com

CB&I Joint Venture Awarded FEED Contract for Freeport Liquefaction Project

Friday, Feb 17, 2012

Effective January 30, 2012, Freeport LNG Expansion, L.P. (Freeport LNG) and a joint venture comprised of Zachry Industrial, Inc. and CB&I (NYSE:CBI) (Zachry/CB&I Joint Venture) entered into a Front-End Engineering and Design Contract (FEED Contract) for the engineering and design of the Freeport Liquefaction Project near Freeport, Texas. Under the FEED Contract, the Zachry/CB&I Joint Venture will engineer and design three LNG liquefaction trains (each rated at 4.4 million tons per year) and corresponding pretreatment facilities to be located near the existing Freeport LNG Regasification Terminal that is owned and operated by Freeport LNG’s parent company, Freeport LNG Development, L.P. Within the three-train design, the Zachry/CB&I Joint Venture will develop a fixed price/fixed schedule proposal for both a one- train initial development and a two-train initial development. This optionality will provide Freeport LNG with the ability to choose the optimum size of the initial phase of the project based upon customer demand and financing considerations. In addition, the design of the three-train project will allow for the efficient expansion of additional liquefaction train(s) and pretreatment facilities after the initial development has commenced.

Zachry and CB&I are world-class engineering and construction companies, and each company has significant experience in the LNG industry, particularly along the U.S. Gulf Coast. Zachry was a member of the consortium that designed and constructed the Freeport LNG Regasification Terminal, thereby giving Zachry a thorough understanding of the infrastructure in the existing facility as well as the local area’s accessibility to labor and supplies. In 2010, CB&I completed the turnkey design, engineering and construction of a similarly-sized LNG liquefaction train near Lima, Peru utilizing technologies and design requirements similar to those anticipated for the Freeport Liquefaction Project. In addition, CB&I recently completed the design, engineering and construction of the Golden Pass LNG Terminal located near Sabine Pass, Texas.

Source: Business Wire

To access over 2,500 of the latest oil projects from across the world visit Projects OGP for free trial today

posted in:

Other Production News

Mesa Energy Holdings, Inc. releases production and financial results for period ended March 31, 2012 17-05-2012
Norwegian Petroleum announce production figures April 2012 16-05-2012
Drake Gold Resources provides production and development update For Pennsylvania oil & gas project 15-05-2012
Gazprom announces first production well launched in Turonian deposit at Yuzhno-Russkoye field 14-05-2012
Drillsearch Energy announces wet gas pilot project commences production 10-05-2012
Gastar Exploration Ltd. reports first quarter 2012 results 10-05-2012
Pace Reports continued oil growth and record production during the first quarter of 2012 09-05-2012
Sound Oil announces Casa Tiberi discovery application for the San Lorenzo production concession 09-05-2012
Lighthouse Petroleum, Inc. update regarding the Lucy Lee 09-05-2012
M Squared pioneers laser hydrocarbon leak detection technology with major Business Growth Fund investment 08-05-2012